Merry Christmas, Happy New Year, and 6 in 6 in 2018!

Merry Christmas (belated) and a Happy New Year – 2018 is 4 days away and I could not be happier to see this year over with!  14 days sitting in the chair, not wanting to do anything of value is on a downhill slide – Still have to continue taking  it easy so my immune system can get over the shock and awe of the wonderful 2017 Type A Flu!  I do not recommend this trip for anyone – In fact, carry a container of wipes and hand sanitizer around your neck along with a mask.  Run from anyone coughing!  If you see a nut job in public with all these goodies hanging around their neck it is ME!  Thank goodness for HEB Curbside!  Go on-line, order groceries, drive up and they load you up!  I will be doing that until the Flu Season is GONE!

We had a quiet Christmas (all cancelled due to illness).  But Santa was good to us.  I upgraded to an iPad Pro 12.9″ with 512GB and purchased a Space Black Milanese Loop watch band for my Apple Watch!  Then as a bonus for being sick, I ordered a Dooney and Burke handbag!  Santa brought Clay some things that he had on his list and a 1950 Kenmore Heavy Duty sewing machine (coming today or tomorrow) for his leather work!  Talk about 2 spoiled kids!   We will share our Christmas with Melissa this coming week-end!  Santa has left some gifts for her also!

OK – now back to the world of quilting, and hopefully I will have a very productive year!

I am going to attempt to do the 2018 Challenge – 6 in 6 in 2018.  This will fit right in with my very low productive 2017 year of quilting.

So here goes:

6 UFO Projects from 2017

  1.  A Bountiful Life (version of Civil War Bride)  I have 6 blocks completed, 4 ready for applique and a remaining 10 to finish the quilt.
  2.  Nesting – 2 blocks completed – remaining 2 blocks waiting for applique
  3.  Stonefields – About 6 blocks waiting for applique (they are small blocks) and Section 5 will be complete – AH half way through the 10 Sections
  4.  Sweet Stitches – trying to convince myself that I love the black embroidery thread (although getting bored with it)  6 more blocks to embroider
  5.  Brinton Hall – I really need to get with the program on this one – just more hexies for the side panels and then I will be piecing the remainder of the quilt.  I would like to have it completed by May – not sure if this is doable!
  6.  Mountmellick – Will be starting Border Number 3 in January – This one is a must finish if I am going to enter it in a quilt show this summer.

6 New Projects for 2018

  1.  Aunt Bea’s Parlor – Embroidery – I am looking forward to working on this one as it will be multi-colored thread – not just black!
  2. Star Dance by Jill Finley – Piecing
  3. Plantation Stars by Heartspun Quilts – Piecing (hum could be the blue and white quilt)
  4. Afternoon Delight by Sue Garmen  A mixture of applique and piecing
  5. Work on my Stars and Churn Dash Reproduction quilt – it will need a design setting also.

There could be some changes for the new projects and will update as I make the final decisions.  But as you can see I am really behind on my hand work.  Could it be those pesky surgeries?  I have more projects that I am thinking of working on, but will wait until I am at 100%.  I would also like to participate in OMG and 12 in 2018.  Maybe I can do without that 8 hours of sleep……

Have a wonderful day – it is nice and cold here in South Texas – 38 degrees for the day and no sun.  It will be this way for a week.  I am enjoying winter so far – much better than the 100 degrees each day this past summer!  Now for more rain!